Connect with us

Community

Dunderberg Spiral Railway: The Abandoned Railroad Hidden in Rockland County

Published

on

Stone archway with greenery surrounding it.

By 1890, Rockland County was on the verge of becoming home to what would have been the world’s largest gravity-powered amusement railway.

Had it been completed, visitors would have boarded steam-powered incline cars at the foot of Dunderberg Mountain near Jones Point. After climbing nearly 900 feet to the summit, they would have transferred to open-air railway cars and coasted nearly nine miles downhill, twisting through spirals, switchbacks, tunnels, and spectacular Hudson River vistas—all without an engine.

Instead, the project ran out of money after only about a year of construction, leaving behind one of New York’s most fascinating abandoned engineering projects.

A Vision Ahead of Its Time

The railway was conceived by Henry J. Mumford, who had found success operating the famous Switchback Railway in Mauch Chunk, Pennsylvania (now Jim Thorpe).

His idea was simple: build an even larger scenic attraction within easy reach of New York City.

Visitors would arrive by Hudson River steamboat at a grand station at Caldwell’s Landing, just south of Jones Point. Plans called for:

  • A massive hotel
  • Restaurants
  • Picnic grounds
  • Observation towers
  • A park at the summit
  • A state-of-the-art gravity railway unlike anything in America

Tickets were expected to cost 50 cents, and developers predicted as many as 300,000 visitors each season.

Construction Begins

Work started in the spring of 1890.

Hundreds of laborers blasted through solid rock using hand drills and black powder, carving railroad grades into the rugged mountainside.

Within months they had completed:

  • Much of the railway bed
  • Two massive incline grades
  • Large stone retaining walls
  • Deep rock cuts
  • A partially completed tunnel
  • An impressive stone arch bridge
  • Miles of construction roads

Considering every shovel of dirt and every stone was moved without modern machinery, historians consider the amount of work completed remarkable.

Then… Everything Stopped

Before a single passenger ever rode the railway, financing collapsed.

Construction halted in late 1890 or early 1891, likely after investors exhausted available capital. Workers abandoned the project almost overnight.

The rails were never installed.

The grand hotels were never built.

The first train never ran.

What’s Left Today?

More than 135 years later, hikers can still discover remarkable remnants hidden within what is now Bear Mountain State Park.

Among them are:

The Tunnel

Perhaps the most famous remnant is a partially completed tunnel, roughly 100 feet long, blasted directly through solid rock.

Although unfinished, its stonework remains remarkably intact and has become a favorite destination for adventurous hikers.

The Spiral Grades

Large sections of the railroad bed remain clearly visible.

The grades wind around Dunderberg Mountain in sweeping curves that would have carried coaster cars through two giant spirals and three dramatic switchbacks overlooking the Hudson Highlands.

Rock Cuts

In several places, workers blasted directly through cliffs, leaving impressive rock walls that still line the abandoned right-of-way.

Some unfinished drill holes where workers planned their next blasts remain visible today.

Stone Bridge

A beautifully constructed stone arch bridge still stands in the woods, another reminder of the craftsmanship invested in a railroad that never carried passengers.

Hiking the Railway Today

Modern hikers can follow portions of the abandoned railway using:

  • Ramapo–Dunderberg Trail
  • Timp–Torne Trail
  • Jones Trail

Many sections of today’s hiking trails actually follow the original railroad grade, making for surprisingly gentle walking despite the mountain terrain.

Why It’s Still Fascinating

Unlike many abandoned railroads that were dismantled after years of service, the Dunderberg Spiral Railway never operated for even a single day.

It remains a time capsule—a nearly complete Victorian engineering project frozen in the woods.

For hikers, photographers, railroad enthusiasts, and local history buffs, it offers one of the most unique adventures in Rockland County.

Walking the trails today, it’s easy to imagine what visitors might have experienced more than a century ago: breathtaking Hudson River views, thrilling downhill rides, and one of the most ambitious tourist attractions ever proposed in the Hudson Highlands.

Photo courtesy: Rich Zecchini

Community

Rockland County Photographer Captures Plane Crossing Bright Moon

Published

on

An incredible capture by Rockland County photographer Owey Cramsie Jr. as a plane passes directly in front of last nights bright moon, creating a stunning shot over Haverstraw and Stony Point.

Another amazing moment captured through the lens of a local photographer!

Continue Reading

Community

Ramapo Clarifies Senior Center on Haverstraw Road Is Not for Sale

Published

on

The Town of Ramapo is addressing public concerns and online speculation surrounding the future of its Senior Center at 319 Haverstraw Road, emphasizing that the Town is not selling the Senior Center or its building.

According to the Town, Veolia Water New York Inc. submitted an unsolicited proposal to purchase approximately three acres of vacant land on the southern portion of the property. The company proposed using the land to construct a water treatment facility designed to address PFAS (per- and polyfluoroalkyl substances) in the drinking water.

Town officials stressed that the proposal does not involve the Senior Center building or its operations, which would remain unaffected and continue operating as usual. The proposal also does not include the sale of the entire property or any portion beyond the approximately three vacant acres.

The Town further clarified that the proposal has not been accepted and that no agreement has been reached regarding the terms of a potential sale.

An item seeking authorization to retain a real estate broker to negotiate the proposal had been placed on the agenda for the October 28, 2026, Town Board meeting. However, the item was subsequently removed from the agenda and was not discussed. As of the Town’s latest statement, the matter has not been scheduled for another meeting.

Officials also addressed a document circulating online, explaining that it was a summary memorandum prepared by the Town’s Finance Director and posted as supporting material for the October 28 meeting agenda. The memorandum did not include specific details of Veolia’s proposal, including the fact that it involved only a portion of the property.

The Town issued the clarification to address confusion and reassure residents that the Senior Center at 319 Haverstraw Road is not being sold and that its continued operation is not affected by the proposal currently under consideration.

Continue Reading

Trending